5 months later, and phase 1 is complete. Now I've got to develop phase 2.
Phase 2
Finish breaking in new gears
Timing belt kit, water pump etc.
Flush coolant system, new thermostat
Replace transmission fluid
Replace all valve cover gaskets, seals
Replace spark plugs, o2 sensors, MAF sensor
Clean throttle body
Replace o rings on engine oil cooler
Replace engine oil
Replace all belts and hoses
Install new transmission oil cooler fan
I'm very close to having the swing puts complete.
